| Type |
Underground |
| Installed capacity |
4 x 205 MW + 1 x 30 MW (Total 850 MW) |
| Size of Powerhouse Cavern (L x W x H) |
168.0 m x 24.5 m x 49.0 m |
| MAIN POWERHOUSE |
| Turbine type |
Francis |
| Number of units |
4 nos. |
| Turbine Centerline Elevation |
EL.914.30 m |
| Design discharge per unit |
232.03 cumec |
| Rated head (Net) |
97.37 m |
| Installed capacity per unit |
205 MW |
| Main inlet valve type and Dia. |
Butterfly type, 6.2 m dia |
| Normal tail water level (All Unit Running) |
EL.924.23 m |
| Minimum tail water level (one unit Running) |
EL.920.19 m |
| Tail water level (PMF) |
EL.945.60 m |
| AUXILLARY POWERHOUSE |
| Type |
Underground |
| Turbine type |
Francis |
| Number of units |
1 no. |
| Turbine Centerline elevation |
EL.917.00 m |
| Design discharge per unit |
33.43 cumec |
| Rated head |
98.90 m |
| Installed capacity per unit |
30 MW |
| Main inlet valve type and Dia. |
Butterfly type, 2.4 m |
| Normal tail water level(All units running) |
EL.923.87 m |
| Minimum Tail water Level(1 unit running) |
EL. 923.43 m |
| Probable maximum tail water level |
EL.949.31 m |